Highways | Bridges | Roads
Landmark Project: Wildlife Protection & Infrastructure Corridor (NH-37)
•Project Designation: Consultancy services for the feasibility study and Detailed Project Report (DPR) for the implementation of critical wildlife-friendly measures.
•Regional Jurisdictions: Strategic development spanning the Nagaon, Golaghat, and Karbi Anglong districts in the state of Assam.
•Project Classification: A complex integration of Brownfield and Greenfield developments focused on the Kaziranga National Park stretch.
•Operational Length: Total project alignment of 85.675 Km, including a high-impact 35 Km elevated section.


Technical Specs & Financial Summary:
•Capital Investment: Total project valuation of Rs. 5,930.86 Cr.
•Direct Civil Costs: Rs. 4,850.87 Cr.
•Land Acquisition (L.A.): Rs. 664.49 Cr.
•Statutory Centages: Rs. 215.27 Cr.
•Infrastructure Standard: 4-lane configuration optimized with a paved shoulder for enhanced throughput and safety.
•Strategic Feature: Designed to mitigate wildlife-human conflict while upgrading regional transport capacity.
Strategic Infrastructure: Indo-Bhutan Border Road
Detailed Project Report (DPR) for Single-Lane Border Connectivity
Project Specifications:
•Project Scope: Consultancy Services for Preparation of DPR for Construction of Single lane Indo-Bhutan border road with provision of link roads to the Border Outposts (BOP).
•Total Length: Approximately 313 km.
•Estimated Cost: ₹1,300 Crores.
•Primary Client: Public Works Department (PWD) & National Highways (NH), Government of Assam.


Strategic Context & Funding:
•International Border Status: The Indo-Bhutan border is an open, officially demarcated international boundary spanning 699 km.
•Regional Alignment: The border adjoins four Indian states: Assam (313 km), Arunachal Pradesh (217 km), West Bengal (183 km), and Sikkim (32 km).
•Government Authorization: The Government of India has approved a dedicated budget of ₹1,259 Crores for the 313 km Assam segment.




Nafra to Vijaynagar Border Highway
Strategic Route: A planned border highway following the 1,688 km McMahon Line between India and China.
Project Valuation: Total estimated cost is approximately INR 40,000 crore.
Funding & Execution: Financed and developed through key institutions, including MoRT&H, BRO, NHIDCL, and PWD (NH).


Consultancy Services for Feasibility Study and Preparation of DPR for Construction of NH Standard-2 Lane Highway (Approx Length:- 230 Km), Arunachal Frontier Highway, also Mago-Thingbu-Vijaynagar Border Highway is a planned border highway in the Indian state of Arunachal Pradesh. The 2,000-kilometer-long road follows the MC mahon line, the international border between India and China. The Government of India estimated the cost of the project to be 40,000 crore.




End Point: Miao (Deban Forest Camp)- The end point is situated on the right bank of the Noa-Dhing river.
Start Point: Hawai (Anjaw District)- Site investigations show the initial point of the alignment with existing road markers.
Package-9: Miao (Changlang) – Gandhigram – Vijaynagar Section.
Location: Arunachal Pradesh
Client: Ministry of Road Transport & Highways (MoRTH), Government of India.
Short Description: Detailed Project Report (DPR) Preparation: Frontier Highway (Package 9).
Project Scope & Alignment:
Development Goal: Implementation of a 2-lane highway in Eastern Arunachal Pradesh, connecting Miao to Vijaynagar.
Start Point: Right bank of the Noa-Dhing river at Ch. 0+000 (Miao).
Length Correction: While PWD records indicate a length of 157 km, topographic surveys have established an observed length of 127 km.
Existing Infrastructure: Characterized as an undeveloped, fair-weather road network.




End Point at Vijaynagar
Start Point at Miao


Project Location
Frontier Highway (Package-8) Hayuliang to Miao Section
Location: Arunachal Pradesh
Client: Ministry of Road Transport & Highways (MoRTH), Government of India.
Short Description: Consultancy Services for preparation of DPR of 2-laning of the proposed Frontier Highway from Hayuliang-Changwinti-Hayuliang-Miao (Changlang) of Arunachal Pradesh in (Package-8) Project length is 185 Km.


Package-6: Migging–Tuting–Zido and Singa–Anelye–Hunli Sections.
Location: Arunachal Pradesh
Client: Ministry of Road Transport & Highways (MoRTH), Government of India.
Short Description: Consultancy Services for preparation of a Detailed Project Report (DPR) of 2-laning of the proposed Frontier Highway from Nafra to Vijaynagar in the state of Arunachal Pradesh